Hi,
1. Copy the freight condition type and create new condition type.
2. Modify the condition as below:
3. Create a new access sequence with general condition table like company code or plant.
4. Assign access sequence to condition type.
5. Maintain condition record for the new condition type in MEK1 with value as 100%.
6. Add the condition type in the pricing procedure in M/08.
7. Test the scenario again with a new PO.
Regards,
AKPT