Hi Sasidhar,
May I ask you a question? I am trying to configured the TCD function in EWM, I got a very basic question here. Hope you can help on it.
scenarios is from plant A to customer A via plant B, the plant B is cross-docking plant. I set up two direct route:
1. A->B: Plant A to Plant B
2. B-CusA: Plant B to Customer A
And a cross-docking route: A-B-cusA which include above 2 routes. and marked as CD route in EWM.
my question is when I should do the route determination? do I need to do it in ERP, like have the same route A->B and B->CusA in ERP, and allow it copy to ODO in EWM? or I should ignore hte ERP route and just do the EWM route determination?
Can you also list the required configuration for TCD if possible?
Thank you very much,
RK