Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3585

Variant configuration BOM selection

$
0
0

Hai,

 

Example :

 

   I have two variant colour (RED, WHITE and BLACK ) and voltage (6V, 12V and 16V)

 

   I created Characterstic in CT04 for Colour and voltage

 

   I create Class 300 and  200 in CL02 in that in assing the characterstics colour and voltage

 

   I Create Configuration material KMAT and i assign the class Note : i didnt select any variant

 

   I create seperate material for each variant RED, White, BLACK, 6V, 12V and 16V

 

   I create dependency in CU01 select pre-condition and create dependency. I did same for each variants

 

   Then That dependency i assigned in BOM and Routing

 

    After all assignment done then I check the result in CU50 by selecting the variant RED and 6V then I checked  the result it viewing all variant which is in the Super BOM


Viewing all articles
Browse latest Browse all 3585

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>