Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3585

All physical samples not created

$
0
0

Dear All,

 

we have assigned Inspection type 01 in material master for the inspection lots for the GRN Inspection.

 

Also, we have assigned Sample Drawing Procedure at inspection plan header as per below detail,

To Partial sample noFactor per sample sizePrimary Pooled Reserve
0011100
0021100
0031100
0041100
0051100

 

we have implemented the maximum sample quantity for the physical sample creation.

 

Please find the below To partial sample no assigned in inspection plan with Operation no.

 

OperationTo partial sample noSample Qty
0010001200 PCE
00200021 PCE
00300031 PCE

 

Physical sample created with 200 PCE quantity only. other two samples for operation 0020 and 0030 not created.

 

what is the reason for other two samples was not created ?

 

please provide your inputs.


Viewing all articles
Browse latest Browse all 3585

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>