Hi,
Is there any config through which we can control whether to download suppressed MRO or not ? Ideally should we be downloading suppressed meter read orders at all ?
Scenario : a Move-out/move-in happening with in a gap of 3 days. Move-in order gets suppressed but is still being downloaded in PROd through EL16.
Thanks,
AM