Is the infotype 41 with the required date type for hiring date with the validity period corresponding to the tine eval date? Normally the IT 41 would be from the service start date or confirmation date to 31.12.9999.
It would be delimited on the termination date. If the person is re-hired it would start again from the re-hire date.